This project consisted of 600+ CAT5E 350MHz cables, 72 fiber optic terminations and multiple CAT3 backbone cables between network cabinets. This project lasted about one year with 70+ major changes during installation and still met every milestone and deadline in place. This install was a Berk-Tek® cable and Ortronics® connectivity products horizontal cabling solution. Installation included one Main Distribution Frame location and two Intermediate Distribution Frame locations. With a high heat environment in this warehouse, AC units are installed onto the cabinets in the IDF locations. We have installed redundant fiber optic backbone cable routes inside inner duct and 100pr / 50pr CAT3 cables from IDF network cabinets to the MDF server room.